Loading...
Loading...
Case Study
EFI provided geosynthetic liner and cover solutions for this landfill project. Formal case study documentation exists in the Old EFI Case Histories archive.
The Challenge
The 40 West Landfill facility in the project site required effective landfill gas management to reduce methane emissions and meet regulatory closure or operational requirements. Uncontrolled gas migration posed environmental and safety concerns.
Our Approach
EFI installed a custom-engineered HDPE geomembrane liner system at the 40 West Landfill facility, providing long-term containment and environmental protection. The system was engineered for long-term durability and minimal maintenance requirements.
Outcomes
Related Work
Aerospace / Government
Meat ProcessingGet a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309