Project Footage
Real footage from real installations. Watch how EFI USA delivers biogas capture, liner systems, and environmental containment across America's toughest jobsites.

3.2 acres
Coverage
18,000 MT CO₂e/yr
Destroyed
90 days
Install Time

Dual-lagoon cover installation with integrated flare system at a 3,200-head dairy operation. EFI designed a custom gas collection network to handle variable biogas flow rates across both lagoons.
2.1 acres
Area
12,500 MT CO₂e/yr
CO₂e
75 days
Timeline

Full liner replacement on a 20-year-old manure lagoon. EFI's crew dewatered, cleaned, and re-lined the 1.8-acre lagoon with 60-mil HDPE in under 45 days, minimizing operational downtime for the dairy.
1.8 acres
Area
45 days
Timeline

Large-scale covered lagoon digester for a major poultry processing facility in North Carolina. The system captures methane from high-BOD wastewater while eliminating neighborhood odor complaints that had triggered regulatory action.
4.5 acres
Area
22,000 MT CO₂e/yr
CO₂e
120 days
Timeline

IAGI-certified double-liner system with leak detection for a new municipal landfill cell. EFI installed primary and secondary HDPE liners with GCL underlayment and a geocomposite leak detection layer across 12 acres.
12 acres
Area
60 days
Timeline

Floating cover installation for a municipal wastewater treatment facility to control odor and reduce algae growth. EFI's Series A cover system met strict NSF and local regulatory requirements for the community-adjacent site.
2.8 acres
Area
30 days
Timeline

Cap-and-flare system on a 4,000-head swine operation's primary lagoon. EFI's zero-cost-to-operator model covered all capital costs, with the farm benefiting from eliminated odor, regulatory compliance, and 50/50 carbon credit revenue sharing.
2.4 acres
Area
9,800 MT CO₂e/yr
CO₂e
60 days
Timeline

HDPE liner system for wastewater treatment lagoons at Sun-Maid's flagship raisin processing facility. EFI custom-fabricated panels at its Gaston facility and completed installation during the plant's scheduled maintenance window.
3.6 acres
Area
35 days
Timeline
Every project starts with a conversation. Tell us about your site and we'll show you what's possible — no obligation, no cost.