Regulatory Compliance Deadlines
Methane regulations are tightening fast. Track every federal mandate, state requirement, and grant window that impacts your operation, and see exactly how EFI can help you comply.
California SB 1383, Full Enforcement Phase
Deadline: January 1, 2026 · California SB 1383 (Lara, 2016)
Full enforcement of California's Short-Lived Climate Pollutant reduction targets: 75% organic waste diversion from landfills and 40% methane reduction from 2013 levels by 2030. Penalties now active for non-compliance.
Action Items
- Audit current organic waste diversion rates
- Implement or upgrade methane capture systems
- Document compliance for CalRecycle reporting
California Dairy Manure Management, Annual Compliance Report
Deadline: April 15, 2026 · CARB Dairy and Livestock Methane Regulation
California dairy operations with 1,000+ milking cows must submit annual methane reduction compliance reports to CARB, demonstrating progress toward SB 1383 targets through verified methane destruction or capture.
Action Items
- Compile annual methane destruction data
- Submit compliance report to CARB
- Schedule system inspection and maintenance
USDA EQIP, Conservation Practice Funding (Waste Management)
Deadline: May 15, 2026 · USDA NRCS EQIP Program
Environmental Quality Incentives Program funding for agricultural waste management systems including lagoon covers, anaerobic digesters, and methane flare systems. Cost-share up to 75%.
Action Items
- Contact local NRCS office for eligibility determination
- Complete EQIP application with conservation plan
- Obtain system design and cost estimates
USDA REAP Grant, FY2026 Application Window
Deadline: June 30, 2026 · USDA Rural Development, 7 CFR Part 4280
Rural Energy for America Program grants covering up to 50% of project costs for renewable energy systems including biogas capture and methane destruction at agricultural operations.
Action Items
- Complete energy audit for eligible facility
- Prepare REAP application with cost-benefit analysis
- Obtain contractor bids for system installation
EPA NSPS Subpart OOOOc, New Source Performance Standards
Deadline: July 1, 2026 · EPA 40 CFR Part 60, Subpart OOOOc
New and modified sources must meet zero-methane-venting standards from day one. Applies to any new lagoon, digester, or waste management facility constructed after the effective date.
Action Items
- Review new facility designs for OOOOc compliance
- Incorporate methane destruction into project plans
- Engage with EFI on pre-construction system design
EPA NSPS Subpart OOOOb, Phase 1 Methane Monitoring
Deadline: August 1, 2026 · EPA 40 CFR Part 60, Subpart OOOOb
Initial methane emissions monitoring and reporting requirements for existing oil and gas operations, landfills, and large dairy/livestock facilities under the Waste Emissions Charge program.
Action Items
- Install approved methane monitoring equipment
- Establish baseline emissions inventory
- Submit initial monitoring plan to EPA
California LCFS, Q3 2026 Pathway Certification Deadline
Deadline: September 30, 2026 · CARB Low Carbon Fuel Standard Regulation
Quarterly deadline to submit or re-certify fuel pathway applications under the Low Carbon Fuel Standard. Dairy and swine biogas pathways require updated lifecycle analysis and third-party verification.
Action Items
- Update lifecycle analysis with current operational data
- Schedule third-party verification audit
- Submit pathway application via LCFS Reporting Tool
Idaho Confined Animal Feeding Operations, Permit Renewal
Deadline: October 1, 2026 · Idaho Administrative Code IDAPA 58.01.16
Idaho CAFO permits require renewal with updated waste management plans. New requirements include methane mitigation documentation and groundwater monitoring for facilities with lagoon systems.
Action Items
- Review current CAFO permit conditions
- Update waste management plan with methane controls
- Submit permit renewal application to Idaho DEQ
Wisconsin NR 243, CAFO Nutrient Management Updates
Deadline: November 15, 2026 · Wisconsin Administrative Code NR 243
Updated Wisconsin CAFO regulations requiring enhanced nutrient management plans and methane documentation for facilities with 1,000+ animal units. Covered lagoon systems receive streamlined permitting.
Action Items
- Update nutrient management plan per NR 243
- Document methane capture/destruction systems
- File updated WPDES permit application
45Q Carbon Capture Tax Credit, Project Start Deadline
Deadline: December 31, 2026 · IRC Section 45Q, as amended by IRA 2022
Projects must begin construction by the deadline to qualify for the enhanced 45Q tax credit of up to $85/ton for carbon capture and sequestration. Methane destruction projects capturing 12,500+ tons CO2e annually are eligible.
Action Items
- Determine project eligibility and CO2e capture volume
- File IRS Form 8933 pre-registration
- Document construction commencement activities
EPA NSPS Subpart OOOOb, Phase 2 Reduction Requirements
Deadline: January 1, 2027 · EPA 40 CFR Part 60, Subpart OOOOb
Mandatory methane emission reductions of 95% or greater for designated facilities. Covered lagoon systems and flare systems must demonstrate compliance through continuous monitoring.
Action Items
- Evaluate cap-and-flare vs. RNG system economics
- Submit compliance pathway selection to EPA
- Begin engineering and permitting for destruction system
New York Climate Act, Agricultural Methane Reduction Targets
Deadline: January 1, 2027 · NY Climate Leadership & Community Protection Act
New York's Climate Leadership and Community Protection Act sets interim 2026 methane reduction milestones for agricultural operations. Dairy farms with 300+ cows should evaluate methane destruction options.
Action Items
- Assess farm-level methane emissions inventory
- Evaluate eligible NYSERDA incentive programs
- Develop methane reduction implementation plan
EPA Greenhouse Gas Reporting, Subpart JJ Annual Submission
Deadline: March 31, 2027 · EPA 40 CFR Part 98, Subpart JJ
Annual greenhouse gas emissions reporting for manure management facilities emitting 25,000+ metric tons CO2e. Reports must include methane generation, capture, and destruction volumes.
Action Items
- Compile annual methane monitoring data
- Calculate Scope 1 emissions using EPA methods
- Submit report via EPA e-GGRT system
Don't Wait for the Deadline
EFI has helped 500+ facilities meet methane regulations with cap-and-flare systems that deploy in weeks, not years. Zero upfront cost to you.