Skip to main content
EFI USA landfill liner installation, aerial view of large-scale geomembrane deployment

Landfill Industry

Landfill Liner Systems &Environmental Containment

2,600+ active MSW landfills across the US depend on engineered liner systems to protect groundwater and the environment. EFI has 30+ years of landfill liner installation experience.

2600+
Active US MSW Landfills
30+
Years Landfill Experience
150 LF
Destructive Test Interval
100 mil
Max HDPE Thickness

The Challenge

Protecting Groundwater from Landfill Leachate

Municipal solid waste landfills generate leachate, a toxic liquid containing heavy metals, organic compounds, and contaminants that can devastate groundwater supplies. Federal Subtitle D regulations require engineered liner and leachate collection systems for all new MSW landfills.

Landfill gas, primarily methane, must be collected and managed to prevent explosions, reduce greenhouse gas emissions, and meet Clean Air Act requirements. Proper cap closure systems are essential for long-term post-closure environmental protection.

  • Leachate contaminates groundwater if liner systems fail
  • Subtitle D and Subtitle C require engineered containment
  • Landfill gas must be collected per Clean Air Act regulations
  • Cap closure systems must perform for 30+ year post-closure periods

Landfill Industry by the Numbers

Active US MSW landfills2,600+
Typical liner thickness60-100 mil HDPE
Destructive test intervalEvery 150 LF
Post-closure monitoring period30+ years
EFI landfill experience30+ years

Our Solutions

Complete Landfill Containment Systems

EFI provides full-service landfill liner installation, leachate collection, cap closure, and gas collection systems, all performed under rigorous QA/QC protocols.

Primary/Secondary Liners

Double-lined systems with 60-100 mil textured HDPE geomembranes, leak detection layers, and GCL installation. Meets all Subtitle D and Subtitle C requirements.

Leachate Collection

Engineered leachate collection and removal systems (LCRS) with geocomposite drainage layers, perforated piping, and sump systems for continuous leachate management.

Cap Closure Systems

Final cover systems including geomembrane caps, gas venting layers, drainage composites, and vegetative support layers designed for 30+ year post-closure performance.

Gas Collection Covers

Geomembrane cover systems for landfill gas collection and control. Integrates with gas-to-energy and flare systems to meet Clean Air Act requirements.

Technical Excellence

Quality Assurance Standards

Every 150 LF
Seam Testing
100% of Seams
NDT Coverage
60-100 mil
Liner Thickness
Textured HDPE
Material
Aerial view of EFI USA landfill liner installation
Case Study

Project Spotlight

40 West Landfill, Hagerstown MD

EFI installed over 1.1 million square feet of HDPE geomembrane liner at the 40 West Landfill in Hagerstown, Maryland, one of the largest single landfill liner installations in the Mid-Atlantic region. The project included primary and secondary liner systems with full leak detection and leachate collection.

Liner Area
1.1M+ SF
Material
HDPE
System
Double-Lined
Underlayment
GCL
View All Projects

FAQ

Landfill Liner Questions

EFI installs complete primary and secondary liner systems using 60-100 mil textured HDPE geomembranes. We also install geosynthetic clay liners (GCL), geocomposite drainage layers, and leak detection systems. All installations include destructive seam testing every 150 linear feet.

A double-lined system includes a primary liner directly beneath the waste, a leak detection layer between the two liners, and a secondary liner as the final barrier. This system ensures that any breach in the primary liner is detected and contained before groundwater contamination can occur. EFI's systems meet or exceed all Subtitle D and Subtitle C requirements.

Yes. EFI installs complete landfill cap closure systems including final cover geomembranes, gas venting layers, drainage composites, and vegetative support layers. Our closure systems meet all RCRA and state regulatory requirements and are designed for long-term post-closure performance.

EFI maintains rigorous QA/QC protocols including destructive seam testing every 150 linear feet, non-destructive air channel and vacuum box testing on all seams, certified material conformance testing, and full third-party CQA oversight.

Need a Landfill Liner Installer?

Get a quote from the most experienced geosynthetic installer in the US.

Or call us directly: (307) 264-0309

Get a Quote