Skip to main content
EFI USA municipal wastewater treatment lagoon cover installation

Municipal Wastewater

Treatment Plant Liners &Cover Systems

16,000+ publicly owned treatment works across the US rely on engineered liner and cover systems. EFI provides lagoon liners, floating covers, and permeable cover technology for municipalities nationwide.

16000+
US Treatment Works
30+
Years Experience
4000+
Projects Since 1994
307,661 SF
SF Largest Cover

The Challenge

Aging Infrastructure Meets Growing Demands

Municipal wastewater treatment plants across the country face aging lagoon infrastructure, tightening discharge limits, and growing odor complaints from expanding residential development. Many facilities need liner replacements, cover upgrades, or treatment improvements without the budget for full plant reconstruction.

Algae blooms, odor emissions, and insufficient contact time for disinfection are common challenges. EFI's engineered cover and baffle systems solve these problems at a fraction of the cost of mechanical treatment upgrades.

  • Aging lagoon liners require replacement to prevent groundwater contamination
  • Odor complaints from H₂S drive community pressure on municipal operators
  • Algae growth reduces treatment efficiency and causes permit violations
  • Insufficient contact time compromises disinfection performance

Municipal Wastewater by the Numbers

Publicly owned treatment works (US)16,000+
EFI largest single cover307,661 SF
Permeable cover systemPE Foam
NSF-approved materialsYes
Installation on active lagoons2-6 weeks

Our Solutions

Municipal Treatment Plant Systems

EFI provides a complete range of geosynthetic liner and cover solutions for municipal wastewater treatment plants, including our permeable cover technology that eliminates algae growth and controls odor without rainwater pumping.

Lagoon Liners

HDPE, XR-5, and RPE geomembrane liners for treatment lagoons, equalization basins, and storage ponds. NSF-approved materials for potable water contact applications.

Floating Covers

Sealed floating covers for odor control and biogas capture at anaerobic and facultative treatment lagoons. Eliminates H₂S complaints and controls algae growth.

Permeable Covers (3R Foam)

EFI's permeable cover system controls odor and algae while allowing rainwater pass-through, no pumping infrastructure required.

Baffle Curtains

Geomembrane baffle curtain systems that increase effective contact time for chlorine disinfection and improve nutrient removal without additional treatment capacity.

Permeable Cover Technology

Materials & Innovation

PE Foam
Permeable Cover
NSF Approved
Material Standards
30+ Years
XR-5 Specialist
XR-5, HDPE, RPE
Cover Materials
EFI USA municipal wastewater lagoon cover at Johnston County NC
Case Study

Project Spotlight

Johnston County NC Raw Water Reservoir

EFI designed and installed a 307,661 square foot floating cover system for the Johnston County, North Carolina raw water reservoir, one of the largest municipal cover installations in the Southeast. The cover system controls algae growth and protects water quality for the county's treatment plant intake.

Cover Area
307,661 SF
Application
Raw Water
Location
Johnston County NC
Purpose
Algae Control
View All Projects

FAQ

Municipal Wastewater Questions

EFI's 3R Foam permeable cover system is a floating cover that allows rainwater to pass through while controlling odor emissions and algae growth. Unlike sealed covers, the permeable system does not require rainwater pumping infrastructure, reducing maintenance and operating costs for municipal treatment facilities.

EFI uses NSF-approved geomembrane materials including XR-5 (a reinforced ethylene interpolymer alloy), HDPE, LLDPE, and RPE for municipal applications. Material selection depends on chemical exposure, UV requirements, and facility-specific conditions. All materials meet potable water contact standards where required.

Baffle curtains are geomembrane panels suspended in treatment lagoons that direct flow patterns to increase contact time between wastewater and treatment processes. This improves disinfection efficiency, nutrient removal, and overall treatment performance without the capital cost of building additional treatment capacity.

Yes. EFI has extensive experience installing floating covers and liner systems on active municipal treatment lagoons without disrupting plant operations. Our crews coordinate with plant operators to maintain treatment continuity throughout the installation process, which typically takes 2-6 weeks depending on lagoon size.

Upgrade Your Treatment Plant

Get a free assessment for liner replacement, cover installation, or treatment improvements.

Or call us directly: (307) 264-0309

Get a Quote