Loading...
Loading...
Case Study
EFI provided geosynthetic solutions for this food processing facility. Formal case study with photos available in both Old EFI and 2014 case study archives.
The Challenge
BilMar Foods's food processing facility in the project site produced high-strength organic wastewater that generated methane-rich biogas in treatment lagoons. The operation needed an engineered containment and gas management solution to meet environmental standards and eliminate fugitive emissions.
Our Approach
EFI installed a custom-engineered floating cover system at the BilMar Foods facility, designed to capture biogas, control odor, and provide reliable containment. The system was engineered for long-term durability and minimal maintenance requirements.
Outcomes
Related Work
Poultry / Food Processing
Food Processing / Agriculture
Food ProcessingGet a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309