Case Study

JBS — Worthington, MN

HDPE cover and enclosed flare system for methane destruction at one of JBS's largest pork processing facilities.

31,000+ tpy
CO2e Destroyed
99.5%
Destruction Efficiency
$2.0M
Total Capex
Client
JBS USA
Location
Worthington, MN
Completed
2024
Industry
Food Processing
System Type
HDPE Geomembrane Cover with Enclosed Flare

The Challenge

Problem

JBS Worthington's open wastewater lagoon was venting approximately 31,000 tCO2e per year of methane equivalent. The facility evaluated RNG conversion but the $10-25M price tag and 5+ year timeline made it impractical. JBS needed a cost-effective methane destruction solution that could be deployed in months, not years, while generating carbon credit revenue.

Our Approach

Solution

EFI installed an HDPE geomembrane cover ($1.16M) and enclosed flare ($150K) with monitoring and O2 injection systems. Total project cost of $2.0M — a fraction of what an RNG system would require. The system was operational within 4 months of contract signing, with carbon credit verification built into the monitoring infrastructure from day one.

HDPE CoverEnclosed FlareO2 InjectionMonitoring

Outcomes

Results & Metrics

31,000+ tpy
CO2e Destroyed
99.5%
Destruction Efficiency
$2.0M
Total Capex
1.7 years
Payback
57.5%
IRR
4 months
Time to Operational

Key Outcomes

  • 31,000-33,000 tCO2e destroyed per year
  • 99.5% methane destruction efficiency
  • $2.0M total project cost (vs $10-25M for RNG)
  • Projected 57.5% IRR
  • 1.7-year payback period
  • Operational in 4 months from contract signing
“We looked at RNG and the numbers just didn't work. EFI gave us a solution at a tenth of the cost that was operational before our next quarterly report. The carbon credit revenue was a bonus we didn't expect.”

Director of Sustainability, JBS USA