ThermaFab baffle curtain system installed in three lagoons to improve wastewater retention time and meet discharge limits.
The Challenge
Problem
The existing baffles at the Town of Bowman's Wastewater Treatment Plant required replacement because of torn sections and missing flotation logs, which were allowing short circuiting and inhibiting the Town's ability to meet their discharge limits. The plant needed new baffles in three lagoons to increase retention time and improve the treatment process.
Our Approach
Solution
ThermaFab, Inc. designed and fabricated new baffles for three lagoons at 147' x 9', 94' x 9', and 93'7" x 9' in size. The material used was 8130 XR-5 from Seaman Corporation, selected for its durability. The baffles were fabricated at ThermaFab's facility in Gaston, SC and installed on schedule.
Outcomes
Results & Metrics
Key Outcomes
- Three lagoons fitted with new baffle curtains
- Baffle sizes: 147'x9', 94'x9', 93'7"x9'
- Increased wastewater retention time in lagoons
- Eliminated short circuiting issues
- Town able to meet discharge limits
- System functioning with little required maintenance
“The new baffles made an immediate difference in our treatment performance. We went from struggling to meet discharge limits to consistent compliance — the short circuiting problem was completely eliminated.”
Town Utilities Supervisor, Town of Bowman