Town of Arlington, Arlington, TN

Case Study

Town of Arlington, Arlington, TN

Geosynthetic-lined sludge storage lagoon for the new Arlington Wastewater Treatment Plant with textured HDPE liner.

Historical scope checked against the original EFI Arlington case history on September 23, 2026. The source is dated September 2006; its operating and maintenance observations are not presented as current performance.

Historical record reviewed .

328,000 SF
Liner Area
60 mil
Liner Thickness
Textured HDPE
Surface Type
Client
Town of Arlington
Location
Arlington, TN
Completed
2006
Industry
Wastewater Treatment
System Type
HDPE Liner System

The Challenge

Problem

Fisher & Arnold, Inc. designed the new Arlington wastewater treatment plant with a 328,000-square-foot sludge storage lagoon. The lagoon received sludge from the SBR building and used aerators for treatment. The design specified a 60 mil textured HDPE liner.

Our Approach

Solution

Environmental Fabrics, Inc. performed the geomembrane installation for the lagoon. The original EFI case history, dated September 2006, records 328,000 square feet of 60 mil textured HDPE. Work began in late summer and was completed on schedule.

HDPE Liner InstallationGeomembrane Welding

Historical record

Documented Scope

328,000 SF
Liner Area
60 mil
Liner Thickness
Textured HDPE
Surface Type
Sludge Storage Lagoon
Project Type
Fisher & Arnold, Inc.
Engineer

Project Details

  • 328,000 square feet of 60 mil textured HDPE installed
  • Liner installation for the sludge storage lagoon
  • Fisher & Arnold, Inc. named as process and civil design engineer
  • Installation completed on schedule, according to the September 2006 case history