Case Study
Town of Arlington, Arlington, TN
Geosynthetic-lined sludge storage lagoon for the new Arlington Wastewater Treatment Plant with textured HDPE liner.
Historical scope checked against the original EFI Arlington case history on September 23, 2026. The source is dated September 2006; its operating and maintenance observations are not presented as current performance.
Historical record reviewed .
The Challenge
Problem
Fisher & Arnold, Inc. designed the new Arlington wastewater treatment plant with a 328,000-square-foot sludge storage lagoon. The lagoon received sludge from the SBR building and used aerators for treatment. The design specified a 60 mil textured HDPE liner.
Our Approach
Solution
Environmental Fabrics, Inc. performed the geomembrane installation for the lagoon. The original EFI case history, dated September 2006, records 328,000 square feet of 60 mil textured HDPE. Work began in late summer and was completed on schedule.
Historical record
Documented Scope
Project Details
- 328,000 square feet of 60 mil textured HDPE installed
- Liner installation for the sludge storage lagoon
- Fisher & Arnold, Inc. named as process and civil design engineer
- Installation completed on schedule, according to the September 2006 case history
Related Work
Similar Projects
Aerospace / GovernmentKennedy Space Center — Cape Canaveral, FL
40 West Landfill Cell 1, Hagerstown, MD
Pulp & PaperRayonier Advanced Materials — Florida
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309