Skip to main content
Bowman Sewer Systems — Bowman, SC

Case Study

Bowman Sewer Systems — Bowman, SC

Floating baffle replacement in three lagoons at the Town of Bowman's wastewater plant, restoring retention time to meet discharge limits.

(1) 147ft x 9ft, (1) 94ft x 9ft, (1) 93ft 7in x 9ft
Lagoon Dimensions
8130 XR-5
Material
Client
Bowman Sewer Systems
Location
Bowman, SC
Completed
2003
Industry
Municipal
System Type
Baffle System

The Challenge

Problem

EFI's ThermaFab division replaced failing baffles at the Town of Bowman's Wastewater Treatment Plant.

Our Approach

Solution

The new baffles in three lagoons increased wastewater retention time to meet discharge limits, replacing torn sections and missing flotation logs.

Baffle System

Outcomes

Results & Metrics

(1) 147ft x 9ft, (1) 94ft x 9ft, (1) 93ft 7in x 9ft
Lagoon Dimensions
8130 XR-5
Material

Key Outcomes

  • Wastewater treatment improved
  • Lagoon Dimensions: (1) 147ft x 9ft, (1) 94ft x 9ft, (1) 93ft 7in x 9ft
  • Material: 8130 XR-5

Have a Similar Project?

Get a free site assessment and custom proposal from our engineering team.

Or call us directly: (307) 264-0309