Case Study
Bowman Sewer Systems — Bowman, SC
Floating baffle replacement in three lagoons at the Town of Bowman's wastewater plant, restoring retention time to meet discharge limits.
(1) 147ft x 9ft, (1) 94ft x 9ft, (1) 93ft 7in x 9ft
Lagoon Dimensions
8130 XR-5
Material
Client
Bowman Sewer Systems
Location
Bowman, SC
Completed
2003
Industry
Municipal
System Type
Baffle System
The Challenge
Problem
EFI's ThermaFab division replaced failing baffles at the Town of Bowman's Wastewater Treatment Plant.
Our Approach
Solution
The new baffles in three lagoons increased wastewater retention time to meet discharge limits, replacing torn sections and missing flotation logs.
Baffle System
Outcomes
Results & Metrics
(1) 147ft x 9ft, (1) 94ft x 9ft, (1) 93ft 7in x 9ft
Lagoon Dimensions
8130 XR-5
Material
Key Outcomes
- Wastewater treatment improved
- Lagoon Dimensions: (1) 147ft x 9ft, (1) 94ft x 9ft, (1) 93ft 7in x 9ft
- Material: 8130 XR-5
Related Work
Similar Projects
Poultry / Food ProcessingPerdue Farms — Lewiston, NC
95%
GHG Reduction
120,000+ tpy
CO2e Avoided
Food Processing / AgricultureSunMaid Growers — Kingsburg, CA
85%
GHG Reduction
3.1 acres
Lagoon Coverage
Food ProcessingJBS — Worthington, MN
31,000+ tpy
CO2e Destroyed
99.5%
Destruction Efficiency
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309