CalBio Dairy Cluster — Hanford, CA

Case Study

CalBio Dairy Cluster — Hanford, CA

Multi-farm covered lagoon digester cluster serving 5 dairies in Kings County, with centralized biogas collection and pipeline injection for RNG production.

5
Dairies Served
42,000+ tpy
CO2e Captured
7 months total
Installation Time
Client
CalBio Enterprises
Location
Hanford, CA
Completed
2023
Industry
Dairy
System Type
Multi-Farm Covered Lagoon Digester Cluster

The Challenge

Problem

CalBio Enterprises needed covered lagoon digesters installed across 5 dairy operations in Kings County as part of a dairy cluster biogas project. Each farm had different lagoon dimensions, soil conditions, and existing infrastructure requiring customized engineering. The aggressive CDFA DDRDP grant timeline required all 5 installations to be completed within a single construction season to meet funding milestones.

Our Approach

Solution

EFI deployed a standardized-yet-customizable CLD installation program across all 5 dairy sites. Each system uses HDPE geomembrane covers with biogas collection headers tied into CalBio's centralized pipeline network. The modular approach allowed EFI to run overlapping installation crews across sites, completing all 5 digesters in 7 months. Each site includes individual gas flow monitoring feeding CalBio's central SCADA system.

Covered Lagoon DigesterHDPE GeomembraneMulti-Site ProgramPipeline Connection

Outcomes

Results & Metrics

5
Dairies Served
42,000+ tpy
CO2e Captured
7 months total
Installation Time
25% per site
Cost Savings
Centralized collection
Pipeline
CDFA DDRDP
Grant Compliance

Key Outcomes

  • 5 dairy CLD systems installed in 7 months
  • 42,000+ tCO2e captured across cluster annually
  • Centralized pipeline connection at all sites
  • CDFA DDRDP grant milestones met on schedule
  • Standardized design cut per-site costs by 25%
  • Individual site monitoring via central SCADA
“Five digesters in seven months — most contractors couldn't do one in that time. EFI's crew rotation model and standardized engineering made the cluster timeline possible.”

CalBio Operations Manager, CalBio Enterprises