Skip to main content
Castelanelli Bros. Dairy Digester Cover, Lodi, CA

Case Study

Castelanelli Bros. Dairy Digester Cover, Lodi, CA

EFI fabricated and installed a 60 mil HDPE digester cover and biogas collection system at Castelanelli Bros. Dairy in Lodi, California, in 2004.

Historical scope checked against EFI's original Castelanelli Bros. Dairy case history. The record describes the 2004 installation and does not establish present operating performance.

Historical record reviewed .

60 mil HDPE
Cover Material
Cover and biogas collection
EFI Scope
2004
Project Year
Client
Castelanelli Bros. Dairy
Location
Lodi, CA
Completed
2004
Industry
Dairy
System Type
HDPE Digester Cover and Biogas Collection

The Challenge

Problem

The dairy added a covered lagoon digester to collect biogas from manure treatment. RCM Digesters was responsible for the overall digester design and construction, with EFI selected for cover fabrication, installation and the biogas system.

Our Approach

Solution

EFI fabricated and installed the 60 mil HDPE cover, including ballast weights and biogas collection beneath the cover. The original project record dates the work to September 2004. A later EPA AgSTAR evaluation also records the digester as operating since September 2004.

Digester Cover FabricationDigester Cover InstallationBiogas Collection

Historical record

Documented Scope

60 mil HDPE
Cover Material
Cover and biogas collection
EFI Scope
2004
Project Year
Lodi, California
Location

Project Details

  • 60 mil HDPE digester cover fabricated and installed
  • Cover ballast weights installed
  • Biogas collection installed beneath the cover

Have a Similar Project?

Get a free site assessment and custom proposal from our engineering team.

Or call us directly: (307) 264-0309