
Case Study
Cavenaugh Hog Farm, Wallace, NC
EFI installed a 74,000-square-foot permeable cover and three floating baffles at Cavenaugh Hog Farm in Wallace, North Carolina, in 2003.
Historical scope checked against the original EFI Cavenaugh Farms case history on September 23, 2026. EFI is credited with the geosynthetic work. The source does not quantify odor reduction or establish present operating performance.
Historical record reviewed .
The Challenge
Problem
The farm's single open manure lagoon retained increasing nutrient levels. The owner and regulators were concerned about whether the acreage available under the land-application permit could accommodate the wastewater volume and nutrient loads.
Our Approach
Solution
Environmental Fabrics, Inc. installed a 15 mm 3R Foam permeable cover over approximately one-fourth of the lagoon and three floating baffles made from 30 mil XR-5. The layout divided the lagoon into one anaerobic and three aerobic treatment cells. The cover measured 74,000 square feet; the baffles measured 250 by 10 feet, 217 by 10 feet, and 182 by 10 feet. The case history records EFI's geosynthetic installation from May to June 2003, completed on schedule. It separately identifies aeration and biological-treatment components supplied by other companies.
Historical record
Documented Scope
Project Details
- 74,000-square-foot permeable cover installed
- Three floating baffles formed four treatment cells
- 15 mm 3R Foam cover and 30 mil XR-5 baffle materials
- Geosynthetic installation completed on schedule in June 2003, according to the case history
Related Work
Similar Projects
Food & BeverageDiageo USVI Rum Distillery — St. Croix, USVI
Municipal WaterJohnston County Raw Water Reservoir, NC
Municipal WaterStaunton Water Treatment Plant, Staunton, VA
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309