Case Study
Mid-America Tanning
EFI provided geosynthetic solutions for this tanning facility's wastewater treatment needs. Case study documentation available in Old EFI archives.
The Challenge
Problem
Mid-America Tanning's tanning facility in the project site produced complex industrial wastewater containing organic compounds that generated biogas during anaerobic treatment. The operation required a robust containment and gas management system to address regulatory compliance and worker safety.
Our Approach
Solution
EFI installed a custom-engineered HDPE geomembrane liner system at the Mid-America Tanning facility, providing long-term containment and environmental protection. The system was engineered for long-term durability and minimal maintenance requirements.
Outcomes
Results & Metrics
Key Outcomes
- Complete containment of wastewater system
- Zero leakage performance
- Regulatory compliance achieved
- Extended system service life
- Reduced maintenance requirements
Related Work
Similar Projects
Aerospace / GovernmentKennedy Space Center — Cape Canaveral, FL
40 West Landfill Cell 1, Hagerstown, MD
Pulp & PaperRayonier Advanced Materials — Florida
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309