Case Study
Nestle Foods Gaffney — Gaffney, SC
EFI provided geosynthetic solutions for Nestle's food processing facility in Gaffney, South Carolina. Recent 2024 project.
The Challenge
Problem
Nestle Foods Gaffney's food processing facility in Gaffney, SC produced high-strength organic wastewater that generated methane-rich biogas in treatment lagoons. The operation needed an engineered containment and gas management solution to meet environmental standards and eliminate fugitive emissions.
Our Approach
Solution
EFI installed a custom-engineered HDPE geomembrane liner system at the Nestle Foods Gaffney facility, providing long-term containment and environmental protection. The system was engineered for long-term durability and minimal maintenance requirements.
Outcomes
Results & Metrics
Key Outcomes
- Complete containment of wastewater system
- Zero leakage performance
- Regulatory compliance achieved
- Extended system service life
- Reduced maintenance requirements
Related Work
Similar Projects
Aerospace / GovernmentKennedy Space Center — Cape Canaveral, FL
40 West Landfill Cell 1, Hagerstown, MD
Pulp & PaperRayonier Advanced Materials — Florida
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309