Loading...
Loading...
Case Study
EFI provided geosynthetic solutions for Nestle's food processing facility in Gaffney, South Carolina. Recent 2024 project.
The Challenge
Nestle Foods Gaffney's food processing facility in Gaffney, SC produced high-strength organic wastewater that generated methane-rich biogas in treatment lagoons. The operation needed an engineered containment and gas management solution to meet environmental standards and eliminate fugitive emissions.
Our Approach
EFI installed a custom-engineered HDPE geomembrane liner system at the Nestle Foods Gaffney facility, providing long-term containment and environmental protection. The system was engineered for long-term durability and minimal maintenance requirements.
Outcomes
Related Work
Aerospace / Government
Meat ProcessingGet a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309