Loading...
Loading...
Case Study
Inflated digester cover system at the Old River dairy operation, capturing biogas, controlling odor, and providing reliable containment.
The Challenge
Old River's dairy operation in the project site faced growing regulatory pressure to manage methane emissions from manure lagoons. Uncontrolled biogas release contributed to odor issues and greenhouse gas emissions, requiring a reliable capture and destruction solution that could operate with minimal oversight in a working agricultural environment.
Our Approach
EFI installed a custom-engineered floating cover system at the Old River facility, designed to capture biogas, control odor, and provide reliable containment. The system also incorporated anaerobic digester to optimize performance and ensure long-term reliability.
Outcomes
Related Work
Poultry / Food Processing
Food Processing / Agriculture
Food ProcessingGet a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309