Orangeburg Water Treatment Plant — Orangeburg, SC
Clearwell baffle installation at the Orangeburg Water Treatment Plant, with five baffles increasing chlorine contact time and treated volume.
(5) 150ft x 17ft baffles
Lagoon Dimensions
8130 XR-5 PW (Seaman Corporation)
Material
Client
Orangeburg Water Treatment Plant
Location
Orangeburg, SC
Completed
2000
Industry
Municipal / Water Treatment
System Type
Baffle System
The Challenge
Problem
EFI's ThermaFab division installed five clearwell baffles at the City of Orangeburg's Water Treatment Plant to meet increased demand and chlorine contact time requirements.
Our Approach
Solution
The baffles significantly increased treated water volume in the smaller tank design.
Baffle System
Outcomes
Results & Metrics
(5) 150ft x 17ft baffles
Lagoon Dimensions
8130 XR-5 PW (Seaman Corporation)
Material
Key Outcomes
- Wastewater treatment improved
- Lagoon Dimensions: (5) 150ft x 17ft baffles
- Material: 8130 XR-5 PW (Seaman Corporation)
Related Work
Similar Projects
Poultry / Food ProcessingPerdue Farms — Lewiston, NC
95%
GHG Reduction
120,000+ tpy
CO2e Avoided
Food Processing / AgricultureSunMaid Growers — Kingsburg, CA
85%
GHG Reduction
3.1 acres
Lagoon Coverage
Food ProcessingJBS — Worthington, MN
31,000+ tpy
CO2e Destroyed
99.5%
Destruction Efficiency
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309