Orangeburg Water Treatment Plant — Orangeburg, SC

Case Study

Orangeburg Water Treatment Plant — Orangeburg, SC

Clearwell baffle installation at the Orangeburg Water Treatment Plant, with five baffles increasing chlorine contact time and treated volume.

(5) 150ft x 17ft baffles
Lagoon Dimensions
8130 XR-5 PW (Seaman Corporation)
Material
Client
Orangeburg Water Treatment Plant
Location
Orangeburg, SC
Completed
2000
Industry
Municipal / Water Treatment
System Type
Baffle System

The Challenge

Problem

EFI's ThermaFab division installed five clearwell baffles at the City of Orangeburg's Water Treatment Plant to meet increased demand and chlorine contact time requirements.

Our Approach

Solution

The baffles significantly increased treated water volume in the smaller tank design.

Baffle System

Outcomes

Results & Metrics

(5) 150ft x 17ft baffles
Lagoon Dimensions
8130 XR-5 PW (Seaman Corporation)
Material

Key Outcomes

  • Wastewater treatment improved
  • Lagoon Dimensions: (5) 150ft x 17ft baffles
  • Material: 8130 XR-5 PW (Seaman Corporation)