
Case Study
Pilgrim's Mt. Pleasant — Mt. Pleasant, TX
EFI performed wastewater expansion and ongoing repair work at this Pilgrim's Pride poultry processing facility. Multiple job phases across 2023-2025.
The Challenge
Problem
Pilgrim's Mt. Pleasant's poultry processing facility in Mt. Pleasant, TX generated significant organic waste streams producing methane-rich biogas. The facility needed to address environmental compliance requirements while controlling odor and reducing greenhouse gas emissions from wastewater treatment systems.
Our Approach
Solution
EFI designed and installed a complete floating cover and liner system at the Pilgrim's Mt. Pleasant facility. The installation included HDPE geomembrane liner for secondary containment and a floating cover system for gas collection and odor control. The system was engineered for long-term durability and minimal maintenance requirements.
Outcomes
Results & Metrics
Key Outcomes
- Complete containment of wastewater system
- Zero leakage performance
- Regulatory compliance achieved
- Extended system service life
- Reduced maintenance requirements
Related Work
Similar Projects
Aerospace / GovernmentKennedy Space Center — Cape Canaveral, FL
40 West Landfill Cell 1, Hagerstown, MD
Pulp & PaperRayonier Advanced Materials — Florida
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309