Rayonier Advanced Materials Expansion — Fernandina Beach, FL

Case Study

Rayonier Advanced Materials Expansion — Fernandina Beach, FL

Lagoon containment expansion at Rayonier's Fernandina Beach pulp mill, adding a 280,000 SF double-lined cell and rehabilitating two existing cells.

280,000 SF
New Liner Area
2
Cells Rehabilitated
Double composite
Configuration
Client
Rayonier Advanced Materials
Location
Fernandina Beach, FL
Completed
2018
Industry
Pulp & Paper
System Type
Lagoon Expansion and Liner Rehabilitation

The Challenge

Problem

Rayonier's Fernandina Beach specialty cellulose mill required expansion of its wastewater containment capacity to support increased production volumes. The existing lagoon system, originally lined by EFI, needed a new cell added and two existing cells rehabilitated to extend their service life. Florida DEP required the expansion to meet updated containment standards including secondary containment and enhanced leak detection.

Our Approach

Solution

EFI returned to the Fernandina Beach facility to install a new 280,000 SF lined lagoon cell with double composite liner, leak detection, and leachate collection. Two existing cells received liner rehabilitation including patch welding, anchor trench repair, and new monitoring wells. All work was coordinated around continuous mill operations to avoid any production impact.

HDPE Liner InstallationLiner RehabilitationLeak DetectionGroundwater Monitoring

Outcomes

Results & Metrics

280,000 SF
New Liner Area
2
Cells Rehabilitated
Double composite
Configuration
40%
Capacity Increase
Zero
Production Impact
Florida DEP updated
Compliance

Key Outcomes

  • 280,000 SF new double-lined lagoon cell
  • 2 existing cells rehabilitated
  • Updated to current Florida DEP standards
  • Leak detection and monitoring installed
  • Zero production impact during construction
  • Extended facility containment capacity by 40%
“We brought EFI back because they built the original system and know our site better than anyone. The expansion was seamless — our mill never missed a beat during construction.”

Facilities Director, Rayonier Advanced Materials

Have a Similar Project?

Get a free site assessment and custom proposal from our engineering team.