Loading...
Loading...
Case Study
Covered anaerobic lagoon and BNR basin at Teys Australia's Lakes Creek plant, treating 550ML of effluent yearly and offsetting boiler fuel.
The Challenge
EFI's third project for Teys Australia, installing a Covered Anaerobic Lagoon (CAL) and Biological Nutrient Removal basin at their Lakes Creek plant.
Our Approach
The system treats 550ML of effluent annually, with captured biogas used in boilers to reduce natural gas consumption.
Outcomes
Related Work
Poultry / Food Processing
Food Processing / Agriculture
Food ProcessingGet a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309