Case Study
Teys Australia Lakes Creek — Beenleigh, Queensland, Australia
Covered anaerobic lagoon and BNR basin at Teys Australia's Lakes Creek plant, treating 550ML of effluent yearly and offsetting boiler fuel.
CAL: 111m x 82m, BNR: 96m x 68m
Lagoon Dimensions
1.5mm & 2.5mm HDPE (Solmax)
Material
550ML/year
Effluent Volume
Client
Teys Australia Lakes Creek
Location
Beenleigh, Queensland, Australia
Completed
2014
Industry
Food Processing / Meat Packing
System Type
Covered Lagoon Anaerobic Digester
The Challenge
Problem
EFI's third project for Teys Australia, installing a Covered Anaerobic Lagoon (CAL) and Biological Nutrient Removal basin at their Lakes Creek plant.
Our Approach
Solution
The system treats 550ML of effluent annually, with captured biogas used in boilers to reduce natural gas consumption.
Floating CoverLinerBiogas SystemSludge Removal SystemAnaerobic Digester
Outcomes
Results & Metrics
CAL: 111m x 82m, BNR: 96m x 68m
Lagoon Dimensions
1.5mm & 2.5mm HDPE (Solmax)
Material
550ML/year
Effluent Volume
Key Outcomes
- Biogas captured and managed
- Lagoon Dimensions: CAL: 111m x 82m, BNR: 96m x 68m
- Material: 1.5mm & 2.5mm HDPE (Solmax)
- Effluent Volume: 550ML/year
Related Work
Similar Projects
Poultry / Food ProcessingPerdue Farms — Lewiston, NC
95%
GHG Reduction
120,000+ tpy
CO2e Avoided
Food Processing / AgricultureSunMaid Growers — Kingsburg, CA
85%
GHG Reduction
3.1 acres
Lagoon Coverage
Food ProcessingJBS — Worthington, MN
31,000+ tpy
CO2e Destroyed
99.5%
Destruction Efficiency
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309