Skip to main content
Teys Australia Lakes Creek — Beenleigh, Queensland, Australia

Case Study

Teys Australia Lakes Creek — Beenleigh, Queensland, Australia

Covered anaerobic lagoon and BNR basin at Teys Australia's Lakes Creek plant, treating 550ML of effluent yearly and offsetting boiler fuel.

CAL: 111m x 82m, BNR: 96m x 68m
Lagoon Dimensions
1.5mm & 2.5mm HDPE (Solmax)
Material
550ML/year
Effluent Volume
Client
Teys Australia Lakes Creek
Location
Beenleigh, Queensland, Australia
Completed
2014
Industry
Food Processing / Meat Packing
System Type
Covered Lagoon Anaerobic Digester

The Challenge

Problem

EFI's third project for Teys Australia, installing a Covered Anaerobic Lagoon (CAL) and Biological Nutrient Removal basin at their Lakes Creek plant.

Our Approach

Solution

The system treats 550ML of effluent annually, with captured biogas used in boilers to reduce natural gas consumption.

Floating CoverLinerBiogas SystemSludge Removal SystemAnaerobic Digester

Outcomes

Results & Metrics

CAL: 111m x 82m, BNR: 96m x 68m
Lagoon Dimensions
1.5mm & 2.5mm HDPE (Solmax)
Material
550ML/year
Effluent Volume

Key Outcomes

  • Biogas captured and managed
  • Lagoon Dimensions: CAL: 111m x 82m, BNR: 96m x 68m
  • Material: 1.5mm & 2.5mm HDPE (Solmax)
  • Effluent Volume: 550ML/year

Have a Similar Project?

Get a free site assessment and custom proposal from our engineering team.

Or call us directly: (307) 264-0309