
Case Study
Central Bi-Products Covered Treatment Cell, Long Prairie, MN
EFI installed an HDPE liner and insulated cover for a new anaerobic pretreatment cell at Central Bi-Products in Long Prairie, Minnesota, in 1997.
Historical scope checked against EFI's original Central Bi-Products case history. The record describes the 1997 installation and does not establish present operating performance.
Historical record reviewed .
The Challenge
Problem
Increased production at the animal by-products plant had overloaded its existing wastewater treatment system. The treatment improvements added a covered anaerobic cell ahead of the existing plant to address the increased load and contain odors.
Our Approach
Solution
EFI completed the geomembrane work using a 60 mil HDPE liner and an insulated 60 mil HDPE cover. The liner provided containment for a cell near a river, while the cover was designed to collect methane and contain odors during anaerobic pretreatment.
Historical record
Documented Scope
Project Details
- 60 mil HDPE liner installed for the pretreatment cell
- Insulated 60 mil HDPE cover installed
- Covered cell added ahead of the existing wastewater treatment plant
Related Work
Similar Projects
Food & BeverageDiageo USVI Rum Distillery — St. Croix, USVI
SwineCavenaugh Hog Farm, Wallace, NC
Municipal WaterJohnston County Raw Water Reservoir, NC
Have a Similar Project?
Get a free site assessment and custom proposal from our engineering team.
Or call us directly: (307) 264-0309