Central Bi-Products Covered Treatment Cell, Long Prairie, MN

Case Study

Central Bi-Products Covered Treatment Cell, Long Prairie, MN

EFI installed an HDPE liner and insulated cover for a new anaerobic pretreatment cell at Central Bi-Products in Long Prairie, Minnesota, in 1997.

Historical scope checked against EFI's original Central Bi-Products case history. The record describes the 1997 installation and does not establish present operating performance.

Historical record reviewed .

60 mil HDPE
Liner Material
Insulated 60 mil HDPE
Cover Material
1997
Project Year
Client
Central Bi-Products
Location
Long Prairie, MN
Completed
1997
Industry
Animal By-Products / Food Processing
System Type
Covered Anaerobic Pretreatment Cell

The Challenge

Problem

Increased production at the animal by-products plant had overloaded its existing wastewater treatment system. The treatment improvements added a covered anaerobic cell ahead of the existing plant to address the increased load and contain odors.

Our Approach

Solution

EFI completed the geomembrane work using a 60 mil HDPE liner and an insulated 60 mil HDPE cover. The liner provided containment for a cell near a river, while the cover was designed to collect methane and contain odors during anaerobic pretreatment.

HDPE Liner InstallationInsulated Cover Installation

Historical record

Documented Scope

60 mil HDPE
Liner Material
Insulated 60 mil HDPE
Cover Material
1997
Project Year

Project Details

  • 60 mil HDPE liner installed for the pretreatment cell
  • Insulated 60 mil HDPE cover installed
  • Covered cell added ahead of the existing wastewater treatment plant